Project: Metro Tunnel Project – Western Portal
Client: CYP Design & Construction
Total concrete poured: Approx. 1634m3
This exciting project involved contributing to the construction of the western tunnel entrance (portal) of the new Metro Tunnel. Works included:
- form and pour base slab
- form and pour tympanum wall
- form and pour temporary dividing wall.
The tight timeframes of the program were met successfully and to a high standard of quality and safety.